Stannard Log Home
Monday, October 8, 2012
Utilities
Gas line and flue connected to the boiler.
Nearly all the circuits have been connected to the circuit breakers. There are regular breakers, ground fault and now arc fault breakers ($$$$$).
The high efficiency boiler is almost ready to be connected, and the electrical panel almost finished.
Ready for stain
Washed and ready for staining.
The house has been power washed in preperation for staining, windows are being masked.
Gas
Gas line in the trench.
Kevin from the gas company installs the regulator/meter. We'll be connected in a few days.
The gas piping has been installed (will be inspected in 2 days). Now a ditch has been excavated to run the gas and electric lines from the street.
Thursday, September 27, 2012
Siding
The back side of gthe garage
The front of the house. Log, Board and batten and windows.
Board and . It looks great, and will be stained along with the logs.Batten siding is installed to non-log exterior walls
Running Wires
Friend Art Szabo came out from New York to help running wire. BIG help Art, THANK YOU!
All the wiring to outlets and switches are run back to the electrical panel in the utility room.
Windows Installed
Pella windows are installed along with doors.
In Floor Heating
PEX in-floor heating tubes (looking up at the ceiling).
We ran the heating tubes for the 2nd floor loft and guest bedroom areas. This included aluminum plates that spread heat and improve condustion through the floor.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)