We are now ready for log installation. The logs arrive Sunday and will be stacked Tuesday and Wednesday (we're having a party to celebrate).
|
Rough grading completed, now there is room for the crane that will lift the logs into place. |
|
The deck is ready. Note the sleepers where the logs go. They raise the logs to allow for 1 1/2 inches of concrete and the finished floor that goes on top. |
|
Rim joists are papered and steel lath applied. The exposed concrete and the lathed areas get stone veneer. |
The SIP roof system has been problematic - two local contractors have backed out on us. We're going to have to bring an installation crew in from Indiana!
No comments:
Post a Comment