Monday, November 19, 2012

Boiler

Boiler fully connected to 4 main zones plus the domestic hot water heater (extreme right).
The boiler was finally plumbed and commissioned.  We lost a week while the plumber went hunting (fortunately he didn't hurt himself) but got the system up and running just in time for the weather to turn cold.

No comments:

Post a Comment