|
Boiler fully connected to 4 main zones plus the domestic hot water heater (extreme right). |
The boiler was finally plumbed and commissioned. We lost a week while the plumber went hunting (fortunately he didn't hurt himself) but got the system up and running just in time for the weather to turn cold.
No comments:
Post a Comment