Monday, May 28, 2012

Pouring Foundation Walls

Setting the rebar for one of the column bases.

The boom truck.

Into the forms it goes.  The pump operator to the right, guy with a vibrating compactor in the back.

Everything gets smoothed out and anchor bolts are installed.

Column base with special bracket in place.  This bolts to the log column that sits on top of the base.
Monday May 22, the foundation walls get poured - another major milestone.  Today we poured about 51 cubic yards of concrete.  Tony and his crew did it with no mishapps (accidents or blowouts).

No comments:

Post a Comment