The walls will be poured on Tuesday the 22nd.
![]() |
Heavy work, the forms are distributed around the footings. |
![]() |
Forms are connected to each other and braced. |
![]() |
Some vertical rebar was missed in the footing pour, so holes need to be drilled (my feet) and rebar epoxied into the holes. |
![]() |
More rebar and forms. |
![]() |
Buttoning up. The last man has to climb out of the foundation. |