 |
Nancy cutting a polystyrene sheet to fit. |
 |
An area sheeted and covered with remesh. |
 |
The mainfolds that the in-floor heating tubes will be connected to. Eventually a framed wall will be installed and the manifold attached to the wall. |
Now 2inch Polystyrene insulation goes down to insulate the slab. As Shane didn't show up Nancy pitched in to help. It was a bit windy, so sometimes the sheets wanted to take off. After te Sheets went down, 6 x 6 inch wire mesh is laid to reinforce the concrete and to support the in-floor heating tubes.
No comments:
Post a Comment