|
PEX tubing attachedd to 6 x 6 wire mesh with cable ties. Note the manifold in the upper center. Each of 6 circuits run to the manifold, each circuit should be no more than 300ft long. The manifold (and all the tubing) will be pressurized for the concrete slab pour. |
|
More tubing. Concrete blocks hold everytinng down on windy days. |
PEX tubing for in-floor heating is installed over the polystyrene. This will be cast into the conrete slab to provide radient heat for the lower level.
No comments:
Post a Comment