Finally, we're pouring the slab. Starting at 7:00am to ensure that the floor would be cured before any afternoon rainstormes (none came). With this done we're out of the dirt and we'll have a flat, solid floor to work on.
 |
Screeding the concrete for a level floor. |
 |
Placinig concrete (careful of my tubes). |
 |
More screeding, this goes pretty fast. |
 |
Trowling off a nice smooth finish - the guys did a great job. |
Tony and his crew were careful not to damage the in-floor heating tubes as the concrete was placed.