Between the garage and the driveway we brought in about 450 tons of structural fill. This is roadbase that compacts well for a substantial base that won't settle. |
Nick riding the Jumping-Jack compactor. Both Nick and Ian spent the entire day compacting the garage fill. |
The garage slab is poured and one of Tony's gues is floating the surface. After this it gets trowled for a finished look. |
We used a tremendous amount of structural fill for the garage floor, compacting as we went so there'e be no settling. Then a 4inch slab of reinforced concrete was poured for the finished garage floor.