| Nancy cutting a polystyrene sheet to fit. |
![]() |
| An area sheeted and covered with remesh. |
![]() |
| The mainfolds that the in-floor heating tubes will be connected to. Eventually a framed wall will be installed and the manifold attached to the wall. |
![]() |
| Nancy cutting a polystyrene sheet to fit. |
![]() |
| An area sheeted and covered with remesh. |
![]() |
| The mainfolds that the in-floor heating tubes will be connected to. Eventually a framed wall will be installed and the manifold attached to the wall. |
![]() |
| Pikes Peak with Rampart Reservoir in the foreground (yes the water levels are low). |
![]() |
| Clear, clear water, made fizzy by a riffle. |
![]() |
| Me sitting on a rock - I managed to avoid falling in. |
![]() |
| Alvin the friendly chipmunk begging for food (he got some). |
![]() |
| Setting the rebar for one of the column bases. |
![]() |
| The boom truck. |
![]() |
| Into the forms it goes. The pump operator to the right, guy with a vibrating compactor in the back. |
![]() |
| Everything gets smoothed out and anchor bolts are installed. |
![]() |
| Column base with special bracket in place. This bolts to the log column that sits on top of the base. |
![]() |
| Heavy work, the forms are distributed around the footings. |
![]() |
| Forms are connected to each other and braced. |
![]() |
| Some vertical rebar was missed in the footing pour, so holes need to be drilled (my feet) and rebar epoxied into the holes. |
![]() |
| More rebar and forms. |
![]() |
| Buttoning up. The last man has to climb out of the foundation. |